1 General Provisions
2 Basic Requirements
3 Equipment Foundation,Foundation Bolt and Base Plate
3.1 Hand-over and Acceptance of Equipment Foundation
3.2 Base Line and Base Mark for Equipment Installation
3.3 Foundation Bolt
3.4 Base Plate
4 Equipment and Material Mobilization
4.1 Equipment Mobilization
4.2 Material Mobilization
5 Converter Installation
5.1 Trunnion Bearing Pedestal and Trunnion Bearing
5.2 Backing Ring
5.3 Furnace Body
5.4 Tilting Device
5.5 Removable Guard Board and Fixed Guard Board
6 Installation of Oxygen Lance and Sublance
6.1 Oxygen Lance
6.2 Sublance
6.3 Nitrogen Sealing Device
6.4 Probe Mounting Machine and Pulling Machine for Sublance
7 Installation of Hood
7.1 Skirt of Hood
7.2 Removable Hood
8 Installation of Waste Heat Boiler
8.1 General Requirements
8.2 Flue
8.3 Boiler Barrel
8.4 Piping for Steam and Water Systems
8.5 Heat Accumulator
8.6 Deoxidization Water Tank
9 Installation of Electric Arc Furnace
9.1 Rail Chair
9.2 Tilting Device
9.3 Tilting Locking Device
9.4 Cradle
9.5 Furnace Body
9.6 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism
9.7 Electrode Lifting Mechanism and Electrode Clamping Mechanism
9.8 Oxygen Lance
10 Installation of Ladle Refining Furnace
10.1 Track for Buggy Ladle
10.2 Buggy Ladle
10.3 Furnace Cover Cradle,Furnace Cover and Furnace Cover Lifting Mechanism
10.4 Electrode Lifting Mechanism and Electrode Clamping Mechanism
11 Installation of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter
11.1 General Requirements
- APP免费
11.2 Vacuum Tank
- APP免费
11.3 Vacuum Tank Cap and Tank Cap Lifting Mechanism
- APP免费
11.4 Vacuum Device
- APP免费
11.5 Oxygen Lance
- APP免费
12 Installation of Recirculation Vacuum Degassing Refining Furnace
- APP免费
12.1 General Requirements
- APP免费
12.2 Vacuum Degassing Chamber Car and Degassing Chamber
- APP免费
12.3 Ladle Lifting Device
- APP免费
12.4 Preheating Device for Vacuum Degassing Chamber
- APP免费
12.5 Oxygen Lance
- APP免费
13 Installation of Casting Equipment
- APP免费
13.1 Ladle Turret
- APP免费
13.2 Tundish Car and Track
- APP免费
13.3 Roaster
- APP免费
14 Installation of Continuous Steel-casting Equipment
- APP免费
14.1 Mold and Vibrating Device
- APP免费
14.2 Secondary Cooling Device
- APP免费
14.3 Exchange Device for Segment
- APP免费
14.4 Withdrawal and Straightening Unit
- APP免费
14.5 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device
- APP免费
14.6 Flame Cutting Machine
- APP免费
14.7 Rocking Shear
- APP免费
14.8 Crop Collecting Device
- APP免费
14.9 Burring Machine
- APP免费
15 Installation of Discharging and Finishing Equipment
- APP免费
15.1 Run-out Roller Table
- APP免费
15.2 Turntable
- APP免费
15.3 Pusher,Puller and Tilter
- APP免费
15.4 Scarfer
- APP免费
15.5 Lifting Guard Board and Marking Punch
- APP免费
15.6 Cross Travelling Trolley
- APP免费
15.7 Centering Device
- APP免费
16 Installation of Hot Metal Mixer
- APP免费
16.1 Base and Roller
- APP免费
16.2 Furnace Shell
- APP免费
16.3 Tilting Device
- APP免费
16.4 Cover Manipulator
- APP免费
17 Installation of Hot Metal Pretreatment Equipment
- APP免费
17.1 Desulfurizer(Dephosphorizer)Conveying Device
- APP免费
17.2 Stirring Desulfurization Equipment
- APP免费
17.3 Injection Dephosphorization Equipment
- APP免费
17.4 Molten Iron Tank Car and Track
- APP免费
17.5 Slag Remover
- APP免费
18 Test Run of Steel-making Mechanical Equipment
- APP免费
18.1 General Requirements
- APP免费
18.2 Test Run of Converter
- APP免费
18.3 Test Run of Oxygen Lance and Sublance
- APP免费
18.4 Test Run of Hood
- APP免费
18.5 Test Run of Waste Heat Boiler System
- APP免费
18.6 Test Run of Electric Arc Furnace
- APP免费
18.7 Test Run of Ladle Refining Furnace
- APP免费
18.8 Test Run of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter
- APP免费
18.9 Test Run of Recirculation Vacuum Degassing Refining Furnace
- APP免费
18.10 Test Run of Casting Equipment
- APP免费
18.11 Test Run of Continuous Steel-casting Equipment
- APP免费
18.12 Test Run of Discharging and Finishing Equipment
- APP免费
18.13 Test Run of Hot Metal Mixer
- APP免费
18.14 Test Run of Hot Metal Pretreatment Equipment
- APP免费
19 Safety and Environmental Protection
- APP免费
Explanation of Wording in This Code
- APP免费
Normative Standard
- APP免费
Explanation of Provisions
- APP免费
Statement on Preparation
- APP免费
1 General Provisions
- APP免费
2 Basic Requirements
- APP免费
3 Equipment Foundation,Foundation Bolt and Base Plate
- APP免费
3.1 Hand-over and Acceptance of Equipment Foundation
- APP免费
3.2 Base Line and Base Mark for Equipment Installation
- APP免费
3.3 Foundation Bolt
- APP免费
3.4 Base Plate
- APP免费
4 Equipment and Material Mobilization
- APP免费
4.1 Equipment Mobilization
- APP免费
4.2 Material Mobilization
- APP免费
5 Converter Installation
- APP免费
5.1 Trunnion Bearing Pedestal and Trunnion Bearing
- APP免费
5.2 Backing Ring
- APP免费
5.3 Furnace Body
- APP免费
5.4 Tilting Device
- APP免费
6 Installation of Oxygen Lance and Sublance
- APP免费
6.1 Oxygen Lance
- APP免费
6.2 Sublance
- APP免费
7 Installation of Hood
- APP免费
7.2 Removable Hood
- APP免费
8 Installation of Waste Heat Boiler
- APP免费
8.1 General Requirements
- APP免费
8.2 Flue
- APP免费
9 Installation of Electric Arc Furnace
- APP免费
9.1 Rail Chair
- APP免费
9.3 Tilting Locking Device
- APP免费
9.4 Cradle
- APP免费
9.5 Furnace Body
- APP免费
9.6 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism
- APP免费
9.7 Electrode Lifting Mechanism and Electrode Clamping Mechanism
- APP免费
10 Installation of Ladle Refining Furnace
- APP免费
10.3 Furnace Cover Cradle,Furnace Cover and Furnace Cover Lifting Mechanism
- APP免费
10.4 Electrode Lifting Mechanism and Electrode Clamping Mechanism
- APP免费
11 Installation of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter
- APP免费
11.2 Vacuum Tank
- APP免费
11.3 Vacuum Tank Cap and Tank Cap Lifting Mechanism
- APP免费
11.5 Oxygen Lance
- APP免费
12 Installation of Recirculation Vacuum Degassing Refining Furnace
- APP免费
12.2 Vacuum Degassing Chamber Car and Degassing Chamber
- APP免费
12.4 Preheating Device for Vacuum Degassing Chamber
- APP免费
13 Installation of Casting Equipment
- APP免费
13.1 Ladle Turret
- APP免费
14 Installation of Continuous Steel-casting Equipment
- APP免费
14.1 Mold and Vibrating Device
- APP免费
14.2 Secondary Cooling Device
- APP免费
14.4 Withdrawal and Straightening Unit
- APP免费
14.5 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device
- APP免费
14.9 Burring Machine
- APP免费
15 Installation of Discharging and Finishing Equipment
- APP免费
15.6 Cross Travelling Trolley
- APP免费
15.7 Centering Device
- APP免费
16 Installation of Hot Metal Mixer
- APP免费
16.1 Base and Roller
- APP免费
16.2 Furnace Shell
- APP免费
17 Installation of Hot Metal Pretreatment Equipment
- APP免费
17.5 Slag Remover
- APP免费
18 Test Run of Steel-making Mechanical Equipment
- APP免费
18.1 General Requirements
- APP免费
18.3 Test Run of Oxygen Lance and Sublance
- APP免费
19 Safety and Environmental Protection
更新时间:2020-09-24 18:19:35