3.14 The Earthing of Auxiliary Equipment in the Equipment Room
3.14.1 Indoor cabling racks and various metal parts must be earthed,and electrical connection must be adopted between sections of the cabling racks.
3.14.2 Equipment supporting members and rebars or metal parts of buildings such as racks,pipelines,supports,metal supporting members,channels and the like shall have electrical connection.